Home > News > Content

Cautions For Installation Of Card Sleeve Joints And Transition Joints

Oct 28, 2021

1. The card sleeve joint transition joint and bottom valve are generally installed on the vertical pipeline, and the medium flows from bottom to top, while the straight-through lifting transition joint should be installed on the horizontal pipeline.

2. The installation position of the swing type transition joint is improperly restricted. It is usually installed in a horizontal pipeline, but it can also be installed in a vertical pipeline or a dumping pipeline.

3. When installing the card sleeve joint transition joint, the bottom valve should be installed at the bottom of the water pump suction pipe. Special attention should be paid to the direction of the medium flow. The normal flow direction of the medium should be consistent with the direction of the arrow indicated on the valve body, otherwise it will Cut off the normal flow of the medium.

4. The straight-through lifting transition joint should be installed on the horizontal pipeline. The transition joint and the bottom valve are generally installed on the vertical pipeline, and the medium flows from bottom to top, because when the sleeve joint transition joint is closed, it will be generated in the pipeline. Water hammer pressure can cause damage to valves, pipelines or equipment in severe cases, especially for large-mouth pipelines or high-pressure pipelines, so it should arouse great attention from those who choose transition joints.


Send Inquiry